Tool 01 · Specification planning

Millwork Budget & Lead-Time Estimator

Set the room, its linear footage and the four decisions that drive cost — timber, construction, AWI grade and finish. The range, the line items behind it and the schedule update as you choose. Print it as a specification brief or carry it straight into a commission inquiry.

1 · Commission scope
2 · Scale — total linear feet
LF
Add together every wall run that carries cabinetry — base, tall and wall units measured once along the wall, plus the island's long side.
Ceiling / elevation height
3 · Timber species / material
Compare these timbers in the Species & CITES Selector.
4 · Construction style
5 · AWI specification grade
6 · Finish system
7 · Architectural add-ons
8 · US regional labor market
Estimated millwork investmentKitchen & Scullery
Target
—
Low—Effective—High—
Phase-by-phase lead time
—
    Outside this millwork figure

      Planning range for US commissions in 2026 — not a quotation. Low and high bracket typical workshop bids (−15% / +20%) for the same specification.

      Method

      How these figures are built.

      Each room starts from a paint-grade, full-overlay, Custom Grade base rate per linear foot at standard ceiling height in a national-average metro: kitchens $1,150 (tall pantry and appliance runs included), libraries $650, dressing rooms $750, wine rooms $1,300. Tables start at $1,400 per foot of length in solid hard maple.

      Factors are then applied in the order a workshop prices them: elevation height, species premium, construction style, AWI grade, finish and percentage add-ons, fixed add-ons, and finally the regional labor multiplier. Premiums are the midpoints of the ranges published in our 2026 cost benchmarks.

      Lead times assume a signed brief: 2–6 weeks of field templating and shop drawings, 8–16 weeks of fabrication and finishing, about a week of site acclimatization, then installation. Inset doors, Premium Grade veneer matching, exotic timbers and hand-applied finishes each extend the fabrication window.

      Figures exclude stone, appliances, cooling equipment and site trades. Every real project is priced by its workshop from approved shop drawings.